TERMS & CONDITIONS

Clear expectations.
Before you commit.

From your first enquiry to an agreed order: understand the specifications, responsibilities and decisions that need written confirmation.

Last updated: November 4, 2026

At a glance

On this page

Website information and project agreements

This website introduces business-to-business manufacturing services. General website content is not a project-specific manufacturing commitment.

These terms govern access to and use of the ProleanMFG website operated by Prolean MFG (Shenzhen) Co., Ltd. They do not replace the specific quotation, order or signed agreement for a manufacturing project.

Material descriptions, process explanations, example tolerances and other guidance help you evaluate options. Suitability for your part depends on engineering review, the specifications you provide and the terms agreed for the project.

The contracting entity, applicable terms and document precedence should be identified in the quotation or agreement before an order is placed. If documents conflict, request clarification rather than assuming that a general website statement overrides your agreement.

An RFQ is the start of a conversation

Submitting an enquiry or uploading a file is not, by itself, acceptance of an order or authorization to start production.

At this pointWhat needs to be clear
EnquiryThe part, intended process, quantity and questions to review.
QuotationThe quoted scope, assumptions, price, validity and exclusions.
Order agreementThe accepted specifications, commercial terms and required approvals.
Production releaseThe agreed revision and any outstanding technical decisions.

Make the requirements unambiguous

Provide accurate project information and identify the requirements that determine whether the part is acceptable.

Do not assume an unmarked dimension is critical or that a certificate, test or special inspection is included. Identify these requirements explicitly and check that they appear in the agreed scope.

  • Part number, drawing revision and the document to follow if CAD and drawing details differ.
  • Material grade, quantity, surface finish and any special treatments.
  • Critical dimensions, tolerances, threads and functional requirements.
  • Inspection records, material documentation, packaging and traceability requirements.
  • Intended use and any application-specific or regulatory requirements that need review.

Your files and intellectual property

Only share material that you have the right to provide for the proposed project.

By submitting files, you confirm that you own the rights or have authority to provide them and that they do not infringe third-party rights. You grant limited, non-exclusive permission to use them for quotation, engineering evaluation and manufacturing related to your enquiry.

You remain responsible for the accuracy and completeness of the information and design you supply. An engineering discussion or manufacturability review is not approval of your product design or intended application unless expressly agreed in writing.

Sharing files does not transfer ownership of your design. Ownership and permitted use of project-specific tooling, deliverables or newly created work should be addressed in the project agreement.

We treat project information as confidential and use reasonable protective measures as described in the Privacy Policy. An upload does not execute an NDA. Complete a required confidentiality agreement before sending sensitive information.

Changes, cancellation and tooling

A changed requirement can affect work already planned or completed.

Send changes with a clear revision reference and identify what has changed. Ask for written confirmation of the effect on price, material, tooling, inspection and timing before relying on the revised scope.

Cancellation charges, work in progress, tooling ownership, storage and future reuse need project-specific agreement. Do not assume that these items are included in a unit price or that an email change is automatically accepted.

Commercial terms and delivery

The quotation and order agreement should make the commercial responsibilities visible.

A website lead-time example is not a guaranteed delivery date for your order. Confirm the schedule and responsibilities for the particular shipment in writing.

  • Currency, payment milestones and any taxes or duties.
  • Freight, packaging, delivery destination and the applicable shipping terms.
  • The event that starts the agreed production schedule.
  • Any dependencies on technical approval, material availability or supplied information.

Inspection, acceptance and concerns

Agree how conformity will be checked before work begins.

Identify the approved specifications, inspection method and any reports or samples required for acceptance. If a part appears not to meet the agreed requirements, provide the order reference, affected quantity, drawing revision and supporting measurements or photographs.

Review the issue against the agreed scope. Any reporting period, warranty, rework, replacement, refund or other remedy must come from the applicable agreement and law; this page does not set a universal remedy for every order.

Website use and responsibility

Use the website for lawful business enquiries without infringing others' rights or interfering with the service.

Website text, images, videos, logos, branding, descriptions and layouts belong to ProleanMFG or its licensors. Do not copy, reproduce, distribute, modify or exploit them without permission or another lawful basis.

We aim to keep information accurate, but do not warrant that it is complete, error-free or suitable for every application. Website content is provided "as is" and "as available". Project-specific requirements need engineering review and written agreement.

To the maximum extent permitted by law, ProleanMFG is not liable for direct or indirect damages, loss of profits, data or business opportunities, or manufacturing decisions based on general website content arising from use of or inability to use the website. This website-use provision does not replace an agreed order remedy or exclude responsibility that applicable law does not allow to be excluded.

External links are provided for convenience. We do not control or endorse independent third-party content and are not responsible for those organisations' practices or policies.

We may restrict, suspend or terminate website access where we believe these terms have been violated. This does not determine the status of an existing order or its separately agreed terms.

Updates and unresolved questions

For a disagreement or unclear requirement, contact quotes@proleantech.com with the relevant quotation, order and revision references.

We may update these website terms and show the updated date here. Continued website use is subject to the revised terms to the extent permitted by applicable law.

For a manufacturing transaction, the applicable agreement and law determine governing law, dispute resolution and responsibility. A jurisdiction is not selected merely by visiting this page. Nothing here limits a right that cannot lawfully be limited.

Prolean MFG (Shenzhen) Co., Ltd., Room 101, Building B, No. 15 Lingxia Road, Bao'an District, Shenzhen 518103, China. Phone: +86 199 2669 6972.

Common questions

Does submitting an RFQ commit me to an order?

Submitting an RFQ begins a review. It does not by itself place an order or authorize production. Check the quoted scope and agreed acceptance process before committing.

Which file applies if the drawing and 3D model disagree?

Flag the discrepancy and agree the controlling document and revision in writing. Do not rely on an assumption about which file automatically takes priority.

Are all tolerances and inspection reports included in the price?

Only rely on the scope confirmed for your quotation or order. Call out critical tolerances, inspection records and documentation requirements before approving the quotation.

Can I change a drawing after approval?

Send the revised file with a change summary and ask for confirmation of the impact. The team needs to review any effect on work in progress, costs and timing before the changed scope can be relied on.

Put the important details in writing.

Bring your drawing revision, quantities and acceptance requirements to the discussion so the quotation can address the same scope you expect.

Contact our team
Scroll to Top